About Us

Power & Fuel

We have been in the Power & Green Fuel business for over 20 years.

We are focused on doing business in Africa & UAE

Providing green solutions, On the low power solutions we handle 5Kw/hr, to 10Kw/hr, To the high-end 20Mw to 800MW of Electrical power or green fuel supply.

We can do custom projects that use different types of Green Fuel.

ABOUT - MR KAMARA

MOHAMED KAMARA - CEO

PROJECT FINANCING

WE REQUIRE AN ONSITE STUDY TO BE DONE (PAID BY THE CUSTOMER) – The purpose of the onsite study is to determine the requirements for installing & integrating of the Turbines including all what equipment will be required. It includes the fuel plant and connecting the fuel system to the fuel distribution pumps.

Cost for the full integration study is at a cost of $ Based on size of project

A full report will be generated, this is a requirement for our installation team prior to connecting all equipment to make sure the substation & transit power lines can handle the load. Furthermore, this also permits & approvals that will be needed for total project from the different Government Agencies.

With regards to Carbon Credits or Carbon Tax incentives, these will be determined during the study.

FOLLOWING IS REQUIRED FROM CUSTOMER

1.The customers bank must send the full CIS regarding their customer, it must be sent to me by email, PDF Image format.

2.RWA Letter (Ready, Willing & Able) This will be done by the Customers Bank (Via SWIFT MT110) It must state that the customer has the funds to purchase the 100-million-dollar SBLC.

a.The RWA letter must be made out on the Banks letterhead and emailed to me stating the bank officials contact details, which will all be verified.

3.Customer is required to pay for all study’s needed to make the project successful including all permits & approvals.

a.Including providing all land necessary to complete the project.

4.Every project requires different financing, the average cost is 12% to 15% of the required amount.) one month before the SBLC expires the customer revolving SBLC will be automatically renewed.

5.The cost of the SBLC depends on the customer credit rating & the Banking institution that is issuing the SBLC.

6.We would prefer if you used HSBC London or Geneva Switzerland (The customer must obtain their own SBLC from their own Bank.)

7.No payment will be made until all contracts are signed by both parties.

8.The customer will receive the first payment in the amount that they paid for the SBLC only, the rest will go to the equipment supplier, Fuel, Power Including the guarantee for the fuel (FPA agreement) for the life of both contracts, (PPA & FPA)

CUSTOMER SATISFACTION

Customer service is everything to us we pride ourselves as an innovative highly engineered experience company that brings a full consortium of highly skilled teams of individuals that have the ability and experience of producing top quality results providing Quality service to all our customers